Skip to main content
Advertising

Workers Needed For Lambeau Field Preparations Saturday

Must Be Able To Carry 50 pounds; Report At 9 A.M. At Mills Fleet Farm Gate On Stadium’s West Side Although a full-scale snow removal operation is not needed today for Lambeau Field, the Green Bay Packers do need assistance Saturday in preparing the stadium for Sunday’s game.

091225shovel215.jpg



Must Be Able To Carry 50 Pounds; Report at 9 A.M. at Mills Fleet Farm Gate On Stadium's West Side

Although a full-scale snow removal operation is not needed today for Lambeau Field, the Green Bay Packers do need assistance Saturday in preparing the stadium for Sunday's game.

Workers, who must be able to carry 50 pounds, are needed to help spread ice melt as well as assist in other areas.

Interested workers – as many as 100 – should report to the Mills Fleet Farm Gate on Lambeau Field's west side, beginning at 9 a.m. Saturday and continuing as long as needed.

Workers need to be at least 15 years old and will receive $8 per hour, with payment to be made immediately upon completion of their work.

This article has been reproduced in a new format and may be missing content or contain faulty links. Please use the Contact Us link in our site footer to report an issue.

Related Content

Advertising